Detailed Engineering Design (DED) Dredging of Bima Port Pond PT Pelabuhan Indonesia III (Persero)

Shipping lanes and port pools are part of port facilities to support shipping security and safety, so these facilities must meet depth specifications and be free from obstacles, either ship frames or coral clusters, so that ships leaving/entering the port are protected from danger/accidents. For this reason, special handling or maintenance is required of the port channel and pool periodically, this is following the vision and mission of PT Pelabuhan Indonesia III (Persero), namely its commitment to excellent service to customers or stakeholders.

In connection with the investment of PT Pelabuhan Indonesia III (Persero) in 2017 related to the Bima Port Pond Dredging Work, given the very limited technical human resources for DED dredging planning, it is deemed necessary to appoint a Planning Consultant who is experienced in the field of dredging project planning to carry out Detailed Engineering Design (DED) work. ) Bima Port Pond Dredging Work.

To support dredging activities in the Bima Port area with optimal planning, PT. The Indonesian Surveyor has been entrusted with the implementation of the DED Dredging Work Consultation at Bima Port.

Categories
WordPress Theme built by Shufflehound. Developed By Geomarine Survey Dinamika IT Team