Hydro-Oceanographic Study of Bumiharjo Terminal Development, Kumai Port PT Pelabuhan Indonesia III (Persero).

PT Pelabuhan Indonesia III (Persero) Cabang Kumai carried out long-term development at the Bumiharjo Terminal with the addition of ± 260 m long jetty. In accordance with the Regulation of the Board of Directors of PT Pelabuhan Indonesia III (Persero) Number: PER.02 / KU.0101 / P.III-2017 concerning the Determination of the 2017 Work Plan and Company Budget for the Head Office, Branches and Company Business Units within PT Pelabuhan Indonesia III (Persero) dated January 10, 2017, it is planned that a 130 m long pier will be developed in 2017.

For the purposes of expansion planning, additional facilities, and licensing requirements, at the Port of Kumai, a hydro-oceanographic study/survey is needed which includes current surveys, river water level elevation measurements, meteorological analysis, and seismic mitigation in locations around this port. This report is issued as the output of the above survey activities, which were carried out based on the employment contract between PT. Surveyor Indonesia (Persero) and PT. Pelabuhan Indonesia III (Persero).

Categories
WordPress Theme built by Shufflehound. Developed By Geomarine Survey Dinamika IT Team